Logo Hymon - Ładowanie strony
Energy Storage Subsidies in Poland 2026 – Up to PLN 19,000
Piktogram Hymon - Aktualności 12 October 2026

Energy Storage Subsidies in Poland 2026 – Up to PLN 19,000

Average reading time 2 min

Piktogram Hymon - Ikona

On October 20, 2026, Poland will launch the second edition of the Home Energy Storage Programme (PME 2). Homeowners with grid-connected renewable energy installations may receive up to PLN 19,000 in subsidies for battery storage systems, thermal energy storage and selected supporting equipment.

The programme has a total budget of PLN 1 billion. Applications will be accepted until October 1, 2027, or until the available funds are exhausted.

How Much Funding Is Available for Energy Storage in 2026?

The subsidy amount depends on the energy settlement system and the technical specifications of the installation:

  • Up to PLN 16,000 - battery storage under the net-billing system.
  • Up to PLN 8,000 - battery storage under the net-metering system.
  • Up to PLN 1,000 - thermal energy storage.
  • Up to PLN 2,000 - additional support for eligible equipment manufactured in the European Union.

The battery storage subsidy covers up to 30% of eligible investment costs, with a maximum of PLN 800 per kWh of nominal storage capacity.

Who Is Eligible for the PME 2 Subsidy?

The programme is designed for individuals who own a grid-connected renewable energy microinstallation.

To qualify, a battery storage system must meet several technical requirements:

  • Minimum storage capacity of 10 kWh.
  • Battery capacity must be at least twice the installed photovoltaic capacity - for example, a 6 kWp solar installation requires at least 12 kWh of storage.
  • An Energy Management System (EMS) must be included.
  • The system must support island operation, providing backup power during grid outages.
  • The purchase and installation cost of the battery, excluding the inverter and EMS, must not exceed PLN 3,000 per kWh.

When and How Can You Apply?

Applications open on October 20, 2026, at 9:00 AM and must be submitted electronically through Poland's Grant Application Generator (GWD).

Investments completed from November 1, 2025, may also qualify, provided they meet the programme's technical and documentation requirements.

How to Choose an Energy Storage System for PME 2

Selecting the right battery storage system requires considering photovoltaic capacity, electricity settlement arrangements, inverter compatibility and programme requirements.

At Hymon Powered by Kajima, we help homeowners select energy storage systems tailored to their existing solar installations and verify compliance with PME 2 requirements.

Hymon | Contact, Selection, Support

At Hymon, we’ll help you choose the right solution - one that meets the grant requirements.

Learn more at (Polish site): https://hymon.pl/przydomowe-magazyny-energii-dotacja/

You can also check out our products in our online store (Shop in polish): https://sklep.hymon.pl

Are you interested?

Contact us!