Over 15 MWp of installed capacity and 12,369 GWh of electricity generated in 2025 represent the scale of the project that Hymon is carrying out for Netto Polska. The energy produced by the installations is used primarily for the stores’ own needs, supports the energy efficiency of the facilities, and reduces the demand for energy supplied from external sources.
The volatility of energy prices and the need for greater energy independence mean that large enterprises are increasingly analysing investments in their own energy infrastructure. Due to its high energy demand, the retail sector is one of the industries in which renewable energy solutions can have a real impact on the way costs are managed.
The project for Netto Polska is part of a long-term cooperation with Hymon. The project has been developed in stages since 2023. It is an example of a shift in the way large enterprises approach energy — from individual renewable energy investments to building their own distributed energy infrastructure that supports business operations.

The still-active project represents one of the significant stages in implementing sustainable development goals, including in the area of electricity generation from renewable sources at NETTO facilities.
As of today, there are over 300 local energy sources operating directly for the needs of individual stores. This model makes it possible to produce energy at the place of its consumption and to increase the share of RES in the ongoing operation of retail facilities.
The project supported three main goals:
The scale of the investment requires combining a uniform design approach with an individual analysis of each location. This includes the standardisation of technical solutions, implementation procedures, the reporting system, and quality control principles. At the same time, each installation is adapted to the roof structure, local electrical infrastructure, shading conditions, and operating conditions of the facility.Technologies used
The installations were based on photovoltaic systems with a capacity of approximately 50 kWp, designed to produce energy for the stores’ own needs.
The project used, among others:
In over 100 locations, full module performance optimisation was applied. This solution was used primarily on facilities where shading, varied roof slope orientation, or other factors affecting the performance of individual modules occurred.
Monitoring enables ongoing observation of energy production, device operating parameters, and the identification of any irregularities in individual locations.
Hymon Powered by Kajima was responsible for the full handling of the investment process — from the technical analysis of the location, through design and selection of solutions, to installation, commissioning, and preparation of as-built documentation.
The scope of work included, among others:
The implementation of the project for NETTO involves a number of implementation challenges. Each facility requires individual preparation, an audit, technical documentation, and the adaptation of solutions to local conditions. At the same time, all installations must meet a common technical, quality, and organisational standard.
A repeatable implementation model is of key importance here, including uniform design procedures, installation standards, progress reporting, photographic documentation, multi-stage acceptances, and quality control carried out at subsequent stages of the investment.
Another important challenge is carrying out work on functioning retail facilities. The stores operate as usual — serving customers, receiving deliveries, and carrying out daily operational work. Therefore, the installation schedule must be planned in such a way as to limit the impact of the work on the ongoing operation of the supermarkets.
In addition, individual locations differ in terms of roof structure, type of roofing, available installation area, level of shading, and the possibilities of connecting the installation to the existing electrical infrastructure. Each project therefore requires an individual analysis, while maintaining a consistent standard for the entire network.
The entire process is supported by precise delivery logistics, coordination of installation teams, documentation control, and a monitoring system that enables remote supervision of the operation of the installations and energy production parameters.

The scale of energy production varies depending on the location and seasonal conditions. In the best months, production in individual locations exceeds 7 MWh. At the same time, the stores’ demand for energy remains significant, including due to the operation of refrigeration systems, air conditioning, lighting, and ongoing customer service. The vast majority of the energy generated by the photovoltaic installations is used directly for the stores’ own needs. The level of use of generated energy is approximately 90%.
Carry out an energy transition for your business!
449.82 kWp photovoltaic system | industrial heat pumps, approx. 750 kW | integration with the plant’s existing infrastructure
The Henkel plant in Stąporków underwent a comprehensive energy modernization project covering two key areas: electricity generation from a photovoltaic system and a change in the method of heat generation through the implementation of industrial heat pumps.
The project was carried out at an operational industrial facility, without disrupting the facility’s day-to-day operations. This required precise coordination of the work with the existing infrastructure, production schedule, plant logistics, and safety requirements.
Hymon was responsible for the project’s implementation as the general contractor and energy partner.
| Object | ZakładThe Henkel Plant in Stąporków |
| Type of Investment | Comprehensive Energy Transformation of an Industrial Facility |
| Scope | Photovoltaic System + Industrial Heat Pumps |
| PV System Capacity | 449,82 kWp |
| Number of modules | 918 units |
| Module Technology | Jinko Solar |
| Heat pump capacity (total) | ~750 kW |
| Number of heat pumps | 3 industrial heat pumps |
| Annual PV production | ~398 683 kWh |
| Reduction of CO₂ emissions | ~474.4 metric tons per year |

The energy transition project at the Henkel plant included two complementary systems:
a photovoltaic system and a cascade heat pump system. Their combined operation helps increase self-consumption of energy from renewable sources and reduce the use of conventional heat sources.
A 449.82 kWp photovoltaic system installed on the roofs of two warehouses
The photovoltaic system was installed on the roofs of two industrial buildings. The system was designed taking into account the available roof area, the technical conditions of the facility, and the plant’s electricity demand profile.
PV System Specifications
Industrial heat pumps with a capacity of approximately 750 kW
The second pillar of the investment was the implementation of industrial heat pumps with a total capacity of approximately 750 kW. The system was designed to serve as a supplementary source for the plant’s heating and process needs, integrated with the existing oil-fired boiler room.
The scope of work on the heat pump system included
The project was carried out at an active industrial facility, which significantly increased the complexity of the implementation. The work had to be carried out without disrupting the facility’s daily operations. This required proper phasing of the work, technical agreements, and ongoing coordination with facility representatives.
The new heat pump system had to be integrated into the plant’s existing heating system. It was crucial to ensure safety, stable operating parameters, and the ability of the heat sources to work together. The heat pumps required the preparation of a reinforced concrete foundation and appropriate installation logistics. Due to the size and weight of the equipment, precise planning of the work was essential.
The installation included DN200-diameter pipelines, which required proper preparation of the technical space, installation, and interdisciplinary coordination. Part of the work was carried out under conditions of limited access and existing utility infrastructure. This required customizing technical solutions during the execution phase.
To complete the process connections, earthwork was necessary, including a trench under the plant road. This stage required special coordination with the plant’s logistics team.
The implemented system reduces the use of conventional heat sources and increases the share of renewable energy in the plant’s operations. The project integrates electricity generation from renewable energy sources, industrial heat pumps, hydraulics, automation, and monitoring into a single, cohesive energy system.

Yes. Implementation at an operational facility is possible, but it requires very precise planning, phased execution, and coordination with the facility’s existing infrastructure. In the case of the Henkel plant in Stąporków, the project included both a photovoltaic system and industrial heat pumps integrated with the existing oil-fired boiler room. The work had to take into account the plant’s schedule, safety, logistics, and limited technical space.
In large industrial facilities, the greatest value comes not from a single technology, but from an integrated energy system. Photovoltaics generate electricity, but their potential increases when they are integrated with the facility’s actual consumption profile, heating system, automation, and monitoring. In the Henkel project, a 449.82 kWp PV system works in conjunction with industrial heat pumps with a capacity of approximately 750 kW to support the facility’s electricity and heating needs.
Before starting the project, it is necessary to analyze not only the energy demand but also the condition of the existing infrastructure, available roof space, installation options, the heating system, automation, connections, plant logistics, and working conditions. Key aspects of the Henkel project included the roofs of two halls, integration with the oil-fired boiler room, a hydraulic system with a glycol circuit, DN200 pipelines, heat buffers, PLC + HMI control, and system operation monitoring.
The results depend on the facility’s operating profile, energy demand, and the technologies selected. In the case of the Henkel plant, the project makes it possible to increase the share of renewable energy in the energy mix, reduce the operation of oil-fired boilers by at least 70%, and cut CO₂ emissions by approximately 474.4 metric tons per year. This type of investment can therefore support not only environmental goals but also greater predictability, control, and efficiency in the operation of the plant’s energy infrastructure.
Contact us!
The record investment in RES strengthens the energy independence of the retail chain and supports the transformation of the Polish retail sector.
This is the present of responsible business. The year 2024 was another key stage in which the net was consistently implementing the strategy for energy independence and sustainable development. To this end, it entrusted Hymon Powered by Kajima, an experienced leader in the RES industry, to the implementation of one of the largest photovoltaic projects in the Polish retail sector so far.
As part of the last stage of this strategic cooperation, modern photovoltaic installations, each with a capacity of 50 kWp, were installed on the roofs of 215 net stores throughout Poland. In total, this gives an impressive 10.75 MW of pure solar energy. It is a continuation of the long-term partnership, in which Hymon Powered by Kajima has completed a total of 284 photovoltaic installations with a total power of 14.2 MWp for the net.
The decision to invest in such a significant investment in renewable energy sources was a natural step for the net, which consistently implements the sustainable development policy and actively responds to contemporary climate challenges. The project has been designed with three key objectives in mind: a significant reduction in the carbon footprint, increasing energy independence and generating long-term financial savings.
This implementation not only significantly reduces the consumption of electricity from the conventional network and reduces the operating costs of stores, but also has a real, positive impact on the natural environment. Each single 50 kWp installation allows you to reduce CO2 emissions by about 27 tons per year. On the scale of the entire new project (215 installations), this means over 5,800 tons of less harmful carbon dioxide that ends up in the atmosphere – every year. To illustrate this scale:
· Annual CO2 emission reduction of more than 5,800 tonnes is the equivalent of carbon dioxide absorbed by over 540 hectares of mature forest.
· The clean energy produced would allow about 2,100 households to be supplied annually.
· This saving also corresponds to the emissions generated by approximately 6,500 passenger flights on the Warsaw-London route.
These numbers translate not only into measurable ecological benefits, but also enhance the positive image of the net brand in the eyes of more and more ecologically aware consumers and business partners.
“The investment in photovoltaic installations allows to largely cover the demand for energy in the months of high sunlight. Thus, we are able to reduce energy consumption from non-renewable sources, and thus – reduce CO2 emissions. dynamic situation on the energy market, the possibility of producing electricity from its own, renewable sources generates a positive impact on the operational budgets of our facilities “- emphasizes Stanisław Tyszka, Energy Manager of Netto Polska.
Each of the 215 installations has been comprehensively designed, implemented and connected to the network by Hymon Powered by Kajima experts. The assembly took place on the roofs of commercial facilities, maintaining the highest safety standards and minimizing the impact on the day-to-day operation of stores. All photovoltaic systems are equipped with:
· Advanced fire protection systems and lightning protection systems.
· Permanent work monitoring systems, enabling optimization of efficiency and predictive maintenance.
· Long-term warranty on components and workmanship.
· Comprehensive service and remote diagnostics.
The applied, first-class technological solutions ensure uninterrupted and stable operation of the installation in various weather conditions, and the net gains full control over the energy efficiency of each of the modernized facilities.
“The project for the net is a unique undertaking, both in terms of scale and technological advancement. With each installation, we used individually selected solutions, guaranteeing not only maximum efficiency, but above all uncompromising safety, reliability and long-term stability This includes integrated fire protection systems, advanced remote monitoring and full lightning protection systems. Our aim was to create a uniform, highly scalable installation model that will work in various locations and will effectively support the customer in achieving his energy and environmental goals by many years “- emphasizes Grzegorz Rutkowski, President of the Management Board of Hymon Powered by Kajima.
The impressive scale of the project places the implementation for the net at the forefront of the largest photovoltaic projects in the Polish retail sector. Thanks to the partnership approach, transparent communication and extensive experience of both parties, the investment runs smoothly, in stages covering subsequent locations throughout the country.
Netto, as a company deeply aware of its role in the energy transformation process, treats photovoltaic investment as an integral part of a broader environmental and social responsibility strategy (ESG).
“In Netto, we consistently focus on sustainable development, which is why we reach for solutions that support us in this. One of the key is photovoltaic panels. Thanks to their use, we significantly reduce our carbon footprint, using clean energy from renewable sources. They are to lead us to an ambitious goal of achieving zero-emission by 2050 “- emphasizes Patrycja Kamińska, PR Manager of Netto Polska. The project directly supports the implementation of ESG objectives, and the precise data generated by photovoltaic installations enable transparent reporting of the impact of the retail network on the natural environment.
The project carried out by Hymon Powered by Kajima for the Netto network is an exemplary example of synergies, in which responsible business effectively combines the pursuit of operational efficiency with proactive climate protection activities. The use of photovoltaic technology on such a large scale clearly proves that renewable energy can successfully support operations of large retail chains, realistically increasing their energy independence and competitiveness on the market.
Thanks to this strategic cooperation, the Sun today supplies hundreds of net stores throughout Poland – with a tangible benefit for the environment, conscious customers and the business itself.
Contact us and see how you can reduce your energy costs and increase your company’s independence with photovoltaics.